Etc Sensor+ Portable Pack CEM+ to CEM3 Retrofit Manual de usuario Pagina 5

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 20
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 4
Introduction 3
Overview of this Manual
Reference this manual throughout the retrofit procedure.
Preparation, page 7- emptying the rack and removing the external components
Remove the CEM+ Backplane, page 8- remove the existing backplane from the pack
Replace Phase A Bus Bar, page 9- remove the old bus bar and install a new one
Attach New Power Harness, page 10- install and secure the power wire harness
adapter
Install CEM3 Backplane, page 10- install the new backplane and connect and secure
the data cabling
Replace AF Cards (AF Packs Only), page 12- remove the existing Advanced Feature
cards and install the new ones
Install New Pack Lid and Reassemble Pack, page 13- install the new pack lid and
reassemble the external components
When viewing this document in electronic form (.PDF file) with Adobe Acrobat Reader, blue
italicized text followed by a page number such as “Overview of this Manual, page 3” is a
link within the document. By clicking on the link, you can jump to that section or topic.
Vista de pagina 4
1 2 3 4 5 6 7 8 9 10 ... 19 20

Comentarios a estos manuales

Sin comentarios